Representative interventions — offices, co-ownerships, industrial sites, new developments — across Belgium and Luxembourg.
DUE DILIGENCE · 10,000 m² · Luxembourg
Technical debt quantified before signing
THE ISSUE
No visibility on the asset's digital maturity ahead of the transaction, with a risk of unidentified technical debt weighing on valuation and negotiation.
BUILD'S INTERVENTION
Full map of the digital infrastructure handed to the owner and the investors. A clear view of the asset, technical debt quantified, and consolidated negotiating arguments before signature.
Engagement: Due diligence
OFFICES & LOGISTICS · 10,000 m² · Liège
A healthy building's digital debt, made visible
THE ISSUE
A building in normal operation — no incidents, no complaints, no awareness of the problem: remote access to building systems and charging stations neither inventoried nor controlled, redundant telecom contracts adding up in the service charges, and operating data processed manually every month.
BUILD'S INTERVENTION
Connectivity and digital infrastructure audit: mapping of access, responsibilities and contracts, review of data flows. Delivered as a ranked priority plan — securing remote access, purging contractual redundancies, automating manually processed data flows. The owner now knows what was exposing them, and what each month was costing.
Engagement: Audit
ATTRACTIVENESS · 10,000 m² · Brussels
Lease secured through Day One connectivity
THE ISSUE
Risk of losing a major tenant over a floor under-provisioned for connectivity at the point of lease negotiation.
BUILD'S INTERVENTION
Emergency client-side management of the network extension to guarantee Day One connectivity meeting the tenant's requirements. Lease signature secured at the last minute.
Engagement: Study & Advisory
CO-OWNERSHIP · around twenty units · Brussels
A co-ownership fibre connection brought out of deadlock
THE ISSUE
A fibre connection file at a standstill in a high-standing residence of around twenty units: standard operator proposals incompatible with the quality of the common areas, undocumented exchanges, diluted responsibilities — and the scheduled copper switch-off weighing on lift lines and intercom systems.
BUILD'S INTERVENTION
Take-over of the file and its history, on-site surveys, multi-operator coordination and technical challenge of their proposals, with a review of innovative technical solutions suited to the building. Compared and costed integration scenarios, with a clear breakdown of who pays for what — resulting in the operators' technical requirements being reconciled with the co-owners' expectations.
Engagement: Study & Advisory
MIXED-USE DEVELOPMENT · 1,400 m² · Antwerp
A new building marketed with its connectivity included
THE ISSUE
For a developer — ten apartments, two offices, one retail unit — connectivity usually comes as an afterthought, once candidates start asking for it. A direct risk to letting appeal and to the marketing schedule.
BUILD'S INTERVENTION
Assistance to the developer from design stage, in concert with the general contractor and the electrician, each remaining in charge of their own lot: external and internal connectivity, the building's digital backbone, operator prerequisites prepared. The building goes to market with its connectivity as a selling point — Day One ready.
Engagement: Study & Advisory
OFFICES · LOGISTICS · INDUSTRIAL · 6,750 m² · Nivelles
Every system on site, on a single backbone
THE ISSUE
A mixed site with inherited external and internal connectivity, and building systems in silos — BMS, intrusion, CCTV, EV charging, fire detection, signage — each with its own network, access and providers. No shared base for the site's data to flow.
BUILD'S INTERVENTION
Overhaul and optimisation of external and internal connectivity, then creation of the building's digital backbone — separate and partitioned from the client's operational networks, which remain their IT team's domain: building systems integrated on a single, segmented, documented base, working hand in hand, each within its own scope. The fourth utility now has its network, governed like the other three.
Engagement: Study & Advisory · Project management
PREVENTION · 15,000 m² · Brussels
Site shutdown avoided at the last minute
THE ISSUE
Unbudgeted diversion of buried telecom services during works, with an imminent risk of the site being shut down.
BUILD'S INTERVENTION
Emergency coordination with the telecom operators to relocate the fibre. Site shutdown avoided, operational continuity secured, and the additional cost contained through early intervention.
Engagement: Project management
OPERATION · 15,000 m² · Brussels
Service charge reduced, data recovered
THE ISSUE
Silent accumulation of obsolete lines, redundant subscriptions and expired maintenance contracts, weighing on the service charge without the property manager's knowledge.
BUILD'S INTERVENTION
Full audit of digital billing, removal of unnecessary costs and simplification of the technical architecture. Immediate reduction in the service charge and a lighter day-to-day load for the property manager.
Engagement: Continuity